Restored Hall Revealed

A steel shed sheltering the timber framed Crossley Hall during repair works has been removed, revealing the restored building for the first time in many months.

The external fabric has been repaired from top to bottom including reroofing, repairing the oak frame and inserting new insulated infill panels. Stone chimneys have been rebuilt and new leaded windows installed.

Work continues inside the building